Commercial Ready Mix Products, Inc. is proud to have been a part of the Herbert C. Bonner Bridge replacement project. The two lane, 3 mile long bridge spans across the Oregon Inlet, which joins the Pamlico Sound to the Atlantic Ocean, connecting Bodie Island and Pea Island. The official groundbreaking for construction took place on March 8, 2016. The Bridge is scheduled to open February 2019. Concrete for this project was supplied by our Nags Head Plant.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/6″][/vc_column][vc_column width=”2/3″][vc_gallery type=”nivo” interval=”3″ images=”1313,1314,1315,1309,1310,1311,1317,1312,1316″ img_size=”full”][/vc_column][vc_column width=”1/6″][/vc_column][/vc_row]